Press / to search · ? for shortcuts
—
Electrical service upgrade — 200A panel
EA
Main panel upgrade to 200A, includes new panel + meter base.
Solar install laborn=0
—
Solar install labor — residential (per DC watt)
WATT
Crew labor only, per installed DC watt. Excludes equipment + permit fees.
Solar install laborn=0
—
Utility interconnection application + study
EA
Filed interconnection application + utility study fees (per project).
Solar install laborn=0